Architecture

MVRDV / teletech call center

dijon02
MVRDV / teletech call center it has been modified: 2013-01-31 di jessica zannori

The Dutch study MVRDV built the new 'teletech call center' by reusing the structure of the first mustard laboratory in Dijon, France. Thanks to the strategy of preserving the existing building, it was possible to limit the budget to just € 4 million, using a greater part of the funds for the interior design. 

Employees are no longer tied to a fixed location, but can be connected wirelessly and choose where to work among the various types of locations, designed by exploiting the possibilities offered by the former industrial space.

dijon01a

dijon03

dijon04

dijon05

dijon06

dijon07

dijon30

You Might Also Like