Architecture

MVRDV / teletech call center

dijon02
MVRDV / teletech call center it has been modified: 2013-01-31 di jessica zannori

The Dutch study MVRDV He has developed the new 'teletech call center' by reusing the structure of the first laboratory of Dijon mustard, France. Thanks to the strategy of preserving the existing building has been possible to limit the budget only 4 million euro, using a greater share of funds for the design of the interior.

Employees are no longer tied to a fixed location, but you can connect wirelessly and choose where to work between the various types of location, designed by exploiting the possibilities offered by the former industrial space.

dijon01a

dijon03

dijon04

dijon05

dijon06

dijon07

dijon30

You Might Also Like

Reply