Certain stiff autumn days anticipate the winter and remind us that it is time to test the functioning of the boiler and the heating system.
Actually it would be preferable to act in advance to make sure there are no surprises, but in the summer to those who would jump to mind to have anything to do with anything that produces heat!
So it is advisable during the system's design of heating take into account products whose reliability is verified through various types of tests.
For example the Ariston boilers before being put on the market are subjected to three types of tests that recreate the most extreme conditions of use, in this way the company is sure to bring in the homes of its customers boilers are characterized by high reliability and safety during normal operation.
The three types of tests used to verify reliability and durability of a boiler are: the Accelerated Life Test, Real Life Test and the Expert center, Analyze them one at a time.
Accelerated Life Test
The Accelerated Life Test allows to concentrate in a short time the whole life of the boiler, which is required to work continuously for hours and hours at the maximum of its functionality. At the end of the test it is verified that the native performance of the boiler is maintained.
Real Life Test
Unlike the Accelerated Life Test, Real Life Test provides the boiler monitoring for two consecutive seasons to standard working hours.
Expert center
The expert Center is the moment in which the experiences of designers, technicians and expert installers are compared. This phase is extremely important because it aims to solve any problems upstream, during the design of the boiler.
Through the Expert Center we analyze and intervene in all areas, from the most technical to that of the relationship with the user, the behavior of all the components is then evaluated to improve quality and reliability.
Below is a video that shows the care with which the Ariston boilers are designed, specifically models Genus Premium Ages e Clas Premium Ages and how easy it is to check that they are kept operational reliability and functionality.